COMPLETE PERMIT APPLICATION AND REQUIREMENTS View Printable Version
- Include two (2) complete sets of architectural/structural plans.
- All buildings described in these plans shall be designed in compliance with the current applicable
codes along with revisions and amendments.
- Two (2) copies of any pertinent ordinances (rezoning), special use permits, special administrative
permits, variances or other documents relating to zoning approval, or other applicable documentation that will support any conversion.
- For projects involving exterior alterations (such as changing roof structure and new cantilevers) with no site work or conversions of single family residence to a duplex, a recent survey sealed by a Georgia Registered Land Surveyor will be required.
- Include the notarized Cost of Construction form.
- Residential Automatic Approval Certification (RAAC) is available for plans prepared by Georgia
registered architect or engineer. Click here for a copy of the RAAC form.
INTAKEThe intake process is the stage in which the permit application is created. During this stage, all drawings are submitted for approval for review and approval.
PERMITTING FEES
No permit or permit fee is required for any work with a total valuation of less than $2,500.00 provided that such work is otherwise lawful. A permit fee of $5.00 per $1,000.00 of valuation; or $50.00 whichever is greater, shall be paid. No permit is valid until such fees have been paid to the City of Atlanta and validated by Bureau of Treasury.
- A reinspection fee of $50.00 shall be imposed for each reinspection once a written notice has been issued requiring the correction of inferior work.
- All building construction begun prior to the issuance of a permit will result in doubled permit fees. Fees are not to exceed $1,000.
- A fee shall be imposed of $1.00 per square foot for signs or $50.00, whichever is greater.
- A fee of double the usual permit fee shall be imposed for signs erected without a permit. Fee shall not exceed $1,000.
- Change of contractor fee shall be $50.00.
CERTIFICATE OF OCCUPANCY FEES
- New One and Two-Family Residences- $50.00
- Additional Units to One and Two-Family Residences- $50.00
- Tenant Building-Out for Residential- $50.00
- Temporary Certificates of Occupancy-$100.00
View Printable Version of Technical Permitting Fee Schedule.
top
CONTACT INFORMATION
|
Agency |
Name |
Telephone |
| Bureau of Buildings |
Arborist Division |
404.330.6836 |
|
Building Inspection |
404.330.6160 |
|
Electrical |
404.330.6180 |
|
Mechanical |
404.330.6265 |
|
Plumbing |
404.330.6170 |
| Traffic |
Latonia Lee |
404.330.6501 |
| Watershed Management |
Water Division |
404.330.6842 |
GENERAL PHONE NUMBERS
| Bureau of Buildings |
404.330.6150 |
| Bureau of Planning |
404.330.6145 |
| Urban Design Commission |
404.330.6200 |
| Department of Watershed Management |
404.330.6224 |
| Department of Public Works |
404.330.6501 |
| Department of Finance |
404.330.6454 |
top
BUILDING PLAN REVIEW
The Bureau of Buildings performs plan review services to verify compliance with Building Code, Life Safety Code, and the Georgia Accessibility Code. All plans submitted for issuance of a building permit must be accurate, legible, drawn to standard scale, include dimensions, and meet minimum industry-wide acceptable architectural and engineering standards. Plans marked “Not Released for Construction”, “Preliminary” and “Permit only” shall not be accepted for review unless otherwise noted for site and foundation permits. In lieu of plan review for one and two family residential construction, the City will accept professional certification. Click here for a copy of the RAAC form.
Click here for Checklist for submission of plans for alterations and repairs to one and two family residences
The City of Atlanta reserves the right to require additional information for plan review analysis.
PERMIT ISSUANCE
Once plans are approved, the permit will be released for issuance by the plan reviewer. The plans are then verified and finalized and paid for at the City of Atlanta, Department of Finance.
Note: Acceptable methods of payment are electronic check, cash, VISA, MasterCard, or certified check. Business checks will not be accepted.
Bureau of Buildings conducts inspections subsequent to the issuance of a permit. Additional inspections are also conducted by the Department of Watershed, Site Development Division. To request an inspection,
click here.
Building Inspection Division
404.330.6160 (office)
404.331.8901 (fax)
The Building Inspection Division inspects all building permits for compliance as well as handling complaints. Building inspections also issue Certificates of Occupancy.
Electrical Division
404.330.6180 (office)
404.658.7374 (fax)
The Electrical Division is responsible for the inspection of all electrical and low voltage permits for code compliance as well as complaints and power authorizations.
Heating, Ventilation, and Air Conditioning (HVAC) Division
404.330.6265 (office)
404.658.6982 (fax)
The Heating, Ventilation, and Air Conditioning (HVAC) Division inspects all HVAC and gas for code compliance.
Plumbing Division
404.330.6170 (office)
404.658.6881 (fax)
The Plumbing Division inspects all plumbing and sprinkler permits for code compliance. Plumbing also handles complaints and sewer tap approvals.
Zoning Division
404.330.6175 (office)
404.331.8902 (fax)
The Zoning Division inspects all sign permits for code compliance, approves all building permits for zoning compliance, and conducts zoning research and verification. Click here for information regarding online zoning verification.
ZONING
Zoning Requirements are governed by the City of Atlanta Zoning Ordinance. The requirements addressed in the Zoning Ordinance include:
-
Setback Requirements
-
Permitted Uses
-
Density
-
Height
-
Off Street Parking
-
Sign Permit
For a complete copy of the City of Atlanta Zoning Ordinance,
click here.
There are also additional requirements for Special Use Permits, Special Administrative Permits, Variances, Special Exceptions, and Certificate of Appropriateness. Please contact the
Bureau of Planning for information.